ÌìÃÀ´«Ã½

×
!

Building Control Act

The aims to ensure that building works comply with standards  for safety, accessibility, environmental sustainability and buildability. All building works, except those that are minor and exempted under the First Schedule of the Building Control Regulations, will require plan approval from the Commissioner of Building Control.

Building works refer to:

  1. Erection, extension or demolition of a building
  2. Alteration, addition or repair of a building
  3. Provision, extension or alteration of any air-conditioning service or ventilating system in or in connection with a building,

and it includes site formation works connected with or carried out for the purpose of (a), (b) or (c).

Building plan approval process

The typical process of getting building plan approval is illustrated in the following flow chart:

life-cycle-of-building-approval

Approved Document

The design and construction of a building must comply to performance requirements prescribed in the Building Control Regulations. Please refer to the  for acceptable solutions.

 

Building Control Act subsidiary legislation:

 
 
 
 
 
 
 

Popular e-Services

The Construction Workforce Registration System (CWRS) is an online portal for CoreTrade and Multi-skilling registration and the renewal of Direct R1 eligibility.

OTMS allows you to register the workers for Identity Verification and to check your registration status online.

Lift and escalator owners, contractors and Specialist Professional Engineers (SPEs) can apply for and view applications for Permit to Operate (PTO) here.